BASEMENT CONCRETE

With the staple-up heating tubing finalized, we back-filled the new plumbing in the basement floor, and poured a new concrete patch. We put a new concrete floor in the cold room while we were at it.

We're into November now, which is about as long as we could wait to pour the concrete with only temporary heat. Carrying 5000lbs of dry mix down the stairs was good exercise..  ;)